Spike a raked stage before technical rehearsal

Reinforce IATSE / dance-supervisor order from production training. Full-out choreography is not run until rake direction, spike marks, and the no-run zones are set.

  1. Confirm rake angle.
  2. Confirm the downstage edge.
  3. Spike marks in a color the lighting will not wash out.
  4. Brief the no-run zones.
  5. Brief the no-slide zones.
  6. Walk the phrase in shoes before full-out.
  7. Adjust spacing for the rake.
  8. Then run.
  9. Do not treat a raked deck like a flat studio.