Shut in a well on a drilling kick
Practice the IADC / IWCF hard shut-in order. Space out, stop pumps, close the BOP, then open the HCR against a closed choke. Do not keep pumps on to “see if it settles.”
- Recognize the kick: pit gain, flow with pumps off, or a drilling break with flow.
- Space out so the tool joint is clear of the BOP.
- Stop the pumps.
- Close the designated annular or pipe rams.
- Open the choke-line HCR against a closed choke.
- Record SIDPP, SICP, and pit gain.
- Notify the company man and the well-control lead.
- Do not open the well or restart pumps until the kill sheet is ready.