Set up an EPA RRP lead-safe work area
Reinforce the EPA RRP order from lead-safe training. Demolition does not start until the pamphlet, signs, containment, and HVAC seals are in place.
- Confirm the firm and renovator certifications.
- Provide the Renovate Right pamphlet and keep the receipt.
- Isolate the work area and post warning signs.
- Cover floors and openings with taped plastic.
- Seal HVAC supplies in the work area.
- Stage waste so dust does not leave the containment.
- Use wet methods or HEPA-shrouded tools; do not dry-sand.
- Clean, then have the certified renovator run cleaning verification.
- Remove containment only after the area passes.