Pass a DMAIC gate before the next phase

Reinforce ASQ DMAIC from quality-engineering training. Improve actions are not funded until Measure and Analyze gates have data.

  1. Define the problem.
  2. Define the CTQ and project charter.
  3. Measure the baseline with a capable measurement system.
  4. Analyze to a verified root cause; do not skip to solutions.
  5. Improve only after the analyze gate review.
  6. Control with a documented reaction plan and owner.
  7. Do not close the project on a pilot that was never put under control.