Pass a DMAIC gate before the next phase
Reinforce ASQ DMAIC from quality-engineering training. Improve actions are not funded until Measure and Analyze gates have data.
- Define the problem.
- Define the CTQ and project charter.
- Measure the baseline with a capable measurement system.
- Analyze to a verified root cause; do not skip to solutions.
- Improve only after the analyze gate review.
- Control with a documented reaction plan and owner.
- Do not close the project on a pilot that was never put under control.