Measure strike and dip on an outcrop
Practice the sequence you already learned for “Measure strike and dip on an outcrop” until the order feels automatic. Drill the structural-geology field order. The reading is not plotted until the surface is identified, the compass is declinated, and strike is read before dip.
- Identify the planar surface you intend to measure.
- Set the compass declination for this map.
- Read strike along the horizontal line of the plane.
- Read dip direction perpendicular to strike.
- Read dip amount.
- Record location, lithology, and the right-hand rule if required.
- Do not plot a magnetic reading as grid without the declination.