Gate a model with an evaluation card

Reinforce model-card / NIST AI RMF order from ML-governance training. Production traffic is not pointed at a new model until the card, fairness slice, and rollback are signed.

  1. Fill the model card: data, intended use, and out-of-scope uses.
  2. Report overall and slice metrics against the gate.
  3. Document known failure modes and human oversight.
  4. Stage behind a flag with a rollback.
  5. Obtain the review signatures.
  6. Do not silently replace a production model from a notebook.