Execute a cGMP batch-record step
Practice the 21 CFR 211.188 batch-record order. Line clearance and the correct record revision are verified first, and the next step is not started until the current step is signed contemporaneously and within specification.
- Verify line clearance.
- Verify the correct batch-record revision.
- Weigh or measure against the issued bill of materials.
- Perform the step exactly as written; do not skip or combine steps.
- Record the actual value, time, and operator at the time of performance.
- Obtain the required in-process check or second-person verification.
- Do not proceed if a result is out of specification; notify QA.