Complete a pre-startup safety review
Practice the sequence you already learned for “Complete a pre-startup safety review” until the order feels automatic. Drill OSHA 1910.119 PSSR from process-safety training. Hydrocarbons or hazardous chemicals are not introduced until punchlist safety items are closed.
- Confirm construction is in accordance with the design.
- Verify safety, operating, maintenance, and emergency procedures are in place.
- Confirm training is complete for the operating crew.
- Walk down punchlist items that affect safe operation and close them.
- Obtain the authorized PSSR signatures.
- Only then introduce hazardous chemicals or raise the unit to operating conditions.