Practice the sequence you already learned for “Complete a Manual J load before selecting equipment” until the order feels automatic. Drill ACCA Manual J from HVAC-design training. A replacement furnace is not sized from the old nameplate or a square-foot rule of thumb.
- Measure orientation, windows, and envelope insulation.
- Estimate infiltration by the taught method.
- Select design temperatures for the location.
- Compute room-by-room heating and cooling loads.
- Sum to the block load and review outliers.
- Select equipment from the Manual S match to that load.
- Do not upsize for future additions without a new J.
- Do not size from the old nameplate or a square-foot rule of thumb.