Call 811 and pothole before you dig
Practice the Common Ground Alliance one-call order from excavation training. Mechanical digging does not start until marks are confirmed and the tolerance zone is potholed.
- Notify 811 with the ticket lead time required in this state.
- Wait for all utilities to mark or to declare clear.
- Walk the marks against the ticket and photographs.
- Pothole by hand or vacuum in the tolerance zone to expose the line.
- Protect the exposed utility before mechanical equipment enters that zone.
- Stop and notify the utility if a mark is missing or a line is struck.